Bathroom renovation: to Begin

The bathroom is an area with particular requirements: high humidity, humidity differences. That is why making repairs in the bathroom, you should clearly plan the whole operating process, to think about the sequence of measures to be performed. In this guide, you will discover the way to start the repair in the restroom and what kinds of work should be performed together with your hands. Step-by-step instructions for toilet repair

Phase 1: Establishing a strategy and selecting a design solution.

Repair in the toilet can be of 2 types:

  • Unplanned, spontaneous, arising from the can of unexpected circumstances. For example, in case of a pipe burst, flooding by neighbors.
  • Planned, that can be either cosmetic or capital. It requires preparation, serious monetary investment and time.

Begin repairs in the bathroom is to determine the design, inside. Think through to the last detail, what will be the room, choose a colour. Pastel colors are conventional, in addition to a mixture of blue and blue, or peach with beige.

Begin repairs in the toilet is to ascertain the design, vsyakuhnya.ru interior design. Think in detail, what will be the space, choose a color. Pastel colours are thought to be traditional, in addition to a combo of colors.

Next point is that the option of facing substance. Generally, finishing at the toilet is done with tile, porcelain tiles, mosaic, vinyl panels. Check the plumbing, whether it ought to be mended. If needed, pick an appropriate alternative. Proceed to the measuring work: quantify all sides, figure out the area of the room. Based on these information, we mark the location of the plumbing fixtures.

Measure 2: the choice of sanitary fittings and material for completing.

It’s crucial to recognize that the purchase of sanitary ware precedes the preparation stage, and not vice versa. This means that first we develop a design project, make a plan, then go to the shop. Yet another point – you should specify the size of your favourite plumbing fixtures and check the plan, whether it matches.

It is very important to realize that the cost of plumbing fittings is completed by a preparation phase, rather than vice versa. This means that first we develop a design project, make a plan, and then go to the store. Another one

In terms of stuff for completing, it’s preferable to get them instantly for the entire repair cycle, so that you won’t be diverted if something was missing. Remember about preparing the essential tools.

Step 3: dismantling tiling and plumbing.

Once all the preliminary work is done, proceed to the beginning of the work process:

  • Remove the sink and tub from the area, even if they won’t be replaced with fresh ones. This manner, you may keep them clean and undamaged.
  • Remove the old tile, cleaning following it all of surfaces: walls, ceiling, floor.
  • Remove paint from the walls, even if they had been formerly painted, because the adhesive alternative or a new layer of paint won’t stick to the surface.

Step 4: Cost of communications: plumbing, electric wiring.

Quite frequently in an old house, you ought to carefully inspect and replace not only the pipes that are in the toilet itself, but in addition the major riser, and on occasion the interfloor plumbing. What’s it worth doing so? Old pipes anytime may give a leak, and then the new repair is going to be spoiled, it will call for extra investment to eliminate flaws.